Hospital Name Second hospital

Working placeMeeting with the Second hospital administration

Working contents

From right side low row: Dr.Ts.Bilegtsaikhan, deputy director of strategy and policy development, Dr. Ts.Soninkhishig (Sonya), CEO of “ToodogNaran” Co., Ltd, Dr.D.Ganzorig, deputy director of diagnostics and treatment

From right side upper row: Ms.Uyanga, head of internal control and hygiene department, Mr. D.Odonchimed, CEO of “Tana lab” Co., Ltd, Ms.A.Enkhtungalag, Head of quality control department of State Inspection Agency Laboratory of Ulaanbaatar, Dr.Battsetseg, bacteriologist of the hospital

Working placeRoom observation of the second hospital

Working contents

Intensive care unit of the hospital

Working placeRoom view to be coated

Working contentsThis ICU rooms take critically ill patients with multiple infections. There are 2 such rooms and they are isolated from bigger ICU room with glass doors and have partition in between, also made with glass. One room has a window, the other room does not have window.

The size of the room A 7×3.130×2.7m, total 98.4 sq.m

The size of the room B 7×3.130×2.7m, 102 sq.m

(including glass walls, ceiling, walls, some permanent furniture, double glass doors, window surface etc coated)

Working placeRoom view to be coated

Working contentsThis is emergency operation room to be coated.

The size of the one room is 8x6 = 48 sq.m

The ceiling is 3m, total 140m2

Arrival at the hospital
Arrival at the hospital
Operation room No3

Preparation

Operation room No3

Preparation



 

Operation room No3

Cleaning

Operation room No3

Cleaning

Operation room No3

Cleaning

Operation room No3

Cleaning

Operation room No3

Cleaning



 

Operation room No3

Initial bacterial count and after cleaning with electrolyzed alkaline water with steam cleaner

Operation room No3

Bacterial test before InviroshieldM5 application.

Operation room No3

Bacterial test before InviroshieldM5 application.

Operation room No3

Application of basecoat



 

Operation room No3

Application of basecoat


TV program making
TV program making

Interview of deputy director Dr.Ts.Bilegtsaikhan

Interview of Mr.D.Odonchimed, director of Tana lab

TV program making

Interview of deputy director Dr.Ts.Bilegtsaikhan

Interview of Mr.D.Odonchimed, director of Tana lab

TV program making

Interview of deputy director Dr.Ts.Bilegtsaikhan

Interview of Mr.D.Odonchimed, director of Tana lab

TV program making

Interview of deputy director Dr.Ts.Bilegtsaikhan

Interview of Mr.D.Odonchimed, director of Tana lab



 

Intensive care unit room A and B
Intensive care unit room A and B
Intensive care unit room A and B
Intensive care unit room A and B

Intensive care unit room A and B
Intensive care unit room A and B
Intensive care unit room A and B

Glass walls

 
 
Moving between rooms
 


 

 


 

Bacterial testing of ICU room

Before and after photocatalyst application

 
 
 
 


 

Final meeting with hospital administration:

From left hand side: deputy director Dr.Ganzorig, director general Dr.Amarjargal, Tana Lab Co., Ltd director Mr.D.Odonchimed, deputy director Dr.Ts.Bilegtsaikhan

Administration expressed their gratefulness and appreciation for the participation in the project to UNIDO Japan, Marusyo Sangyo Co., Ltd and people of Japan.

 

Categories:

Tags:

Comments are closed